The project provides the accommodation for 3-storey locked house (8 blocks) (building № 2) consisting of:
- Technical underground in A/2-V axes for each unit separately on revoked-1, 00 -2.80 for routing of engineer utilities. Height of the technical underground -1.80 m;
- The first floor (on the block) of the project proposes placing of the following premises: parking for 1 m / m -18.83 m2; boiler room with a separate entrance, 8, 15 м2; kitchen 16, 56 м2; bathroom -2.12 м2; staircase for 2 , 3rd floors -8.23 м2; corridor -7.71 м2; vestibule -3.18 м2; outdoor terrace-17, 96 м2.
Room height - 3.00 m;
- The second floor (on the block)of the project proposes placing for the following rooms: two living rooms -25.65 м2 and 25.21 м2; closet-5, 77 м2; bathroom combined -3.63 м2; bathroom - 2.12 м2; stair unit - 8.23 м2.
Room height-3, 00 m
- The third floor (on the block)of the project provides accommodation for following premises: three living rooms - 13.98 м2, 13.93 м2 and 25.51 м2; two storage rooms - 2x2, 16 м2; bathroom with WC - 2.9 м2; ladder block -7 , 45 м2.
Room height-3, 00 m.
Facade decision
Facing bricks with a combination of yellow and red hues. Cap is plastered and painted by acrylic facade paint of a gray color. Gable roof is soft light brown type («Tegola»).
Architectural laboratory offers the full range of services: from the initial permits, the development of all project stages to approval of projects and supervision.