закрыть
Mы победители!
We are winners!
Эскиз застройки территории в пос. Тимоново, Солнечногоский район
Читать новость / Read the news
закрыть
Mы победители!
We are winners!
Ёскиз застройки территории в пос. “имоново, —олнечногоский район
Читать новость/ Read the news
ALPN.ru / Portfolio / Details and small forms / Reconstruction and redevelopment areas project, located on the 1st floor of 25 storey residential building Search      Sait map      Страница на русском

home

polina nozdracheva

alpn

portfolio

news

publications

partners

contacts

Reconstruction and redevelopment areas project, located on the 1st floor of 25 storey residential building

12345678910




Address:

Southern Western Administrative District, Piatnitskoye shosse, 15-3.

Period:

2010

Heads:

"Architectural Laboratory of Polina Nozdracheva" ltd. "Ekoprof" ltd.

Assistents:

Head specialist: Zhdanova M.V.

Contents

1. The title page

2. Contents

3. Help

4. Plan BTI

5. Explanatory Note

6. Mounting a floor plan XI (AP-1)

7. Floor plan XI (AP-2)

8. Mounting a floor plan XIa (AR-3)

9. Floor plan XIa (AR-4)

10. Mounting a floor plan XII (AR-5)

11. The plan area XII (AR-6)

12. Mounting a floor plan XIIa (AP-7)

13. Floor plan XIIa (AR-8)

14. The design of the aperture gain in room. XI (AC-3)

15. Appendix

Explanatory Note

The project was implemented by companies: LLC "Architectural Laboratory of Polina Nozdracheva" and LLC "Eco-prof». 

 The plan for BTI and technical requirements of the customer to redevelop the premises is the  basis for designing .


The proposed premises for development are located HA1 floor, 25-storey residential building. 



 1. Works on the reconstruction and redevelopment include: 

Room XI:

 In note "1" there is the unit of opening in the wall supporting 1.1 x2, 1m and installing doors. Strengthening of the opening see page KR-1. 

 In note "6" there is the construction of new partitions to organize the notes "3,4,5". In the outer wall of the dismantling of window piers and window frames. Installation of two new cell-plastic glazing. See the project of reconstruction work - kind of photographic images 8. 

 In note "5" there is the installment of plumbing fixtures. Connecting devices and ventilation to the existing risers that are intended for non-residential premises. 

   In note "3" the initiation of the opening. 

XIa Premise:

 In note "1" there is construction of new partitions to organize the note "2.5." In the outer wall of the dismantling of the window frame and window sill part of the window. Installing a new two chamber glass-plastic bag and insulated doors. See the project of reconstruction work - kind of photographic images 6. 

 In note "2" there is the opening and the initiation of a new device in the septum in the note «3». 

   In note  "3" shell removal and transfer it to the note"4." Connection to existing standing-stone. 


room XII:

 In pom. "1" construction of new partitions to organize the note. "2, 3,4,5,6." In the outer wall of the demon-TAR window piers and window frames. Installation of two new cell-plastic glazing. See the project of reconstruction work - photographic images form 9. 

 In note "3" there is installation of plumbing fixtures. Connection to existing risers. 

 In note "5" there is initiation of the opening. 

 In note "8" there is unit of the new partitions to organize the note "7". Partial initiation of the opening. 

room XIIa:

 in note "1" there is construction of new partitions to organize the pom. "4", the dismantling of barriers and SANTECH's technical equipment. In the outer wall of the dismantling of the window frame and window sill part of the window. Installation of two new cell-plastic glazing and insulated doors. See the draft recon-structive work - photographic images form 5. 

 In note   "2" dismantling of shell doors. Laying the opening and the new device, the installation of doors. 

   In note  "3" there is the initiation of the opening. 

2. In areas of wet floor waterproofing process is performed in accordance with SNIP.

3. Interior decoration is designed in accordance with the requirements of fire safety and sanitation in elementary hygiene, the charges for these facilities and enhance the aesthetic requirements. According-ly in the bathrooms are made of ceramic tiles.

4. The existing electrical network. Electricity is provided from the existing board of the building.

 5. The above does not violate the redevelopment of the spatial rigidity and strength of the building, keeping the design decision bearing structures and basic utilities: heat risers,

sewer, water, backbone wiring, that complies with SNiP 2.08.02-89 * "Public buildings and facilities" fire and sanitation requirements. 

6. Also agreed, while others work on the redevelopment of premises does not provide a floor. Heating, ventilation, electricity, water and sanitation, internally-focusing, all bearing, and not specified above, the external walling remain unchanged.


Architectural laboratory offers the full range of services: from the initial permits, the development of all project stages to approval of projects and supervision.

107031, Moscow, Petrovka str., 27, tel: (495) 694-61-25, fax: (495) 694-67-80,mail: info@alpn.ru

   

© Все материалы данного сайта являются объектами авторского права (в том числе дизайн). Запрещается копирование, распространение (в том числе путем копирования на другие сайты и ресурсы в Интернете) или любое иное использование информации и объектов без предварительного согласия правообладателя.

Яндекс цитирования
Во избежании недоразумений проверьте правильность ввода телефона:
Верно
Ввести еще раз
закажите звонок
Перезвоните мне