Detailed documentation on the conversion of premises for storage of dry products № G4 BO37
1
2
3
4
Address:
Moscow region, Sheremetyevo-3 terminal "D"
Period:
2010
Heads:
"Architectural Laboratory of Polina Nozdracheva" ltd.,
the head specialist: M.V. Zhdanova
Assistents:
"Ekoprof" ltd.
Contents
1. The title page p>
2. The composition of the project p>
3. Contents of Volume p>
4. TOR for the design p>
5. Help p>
6. Explanatory Note p>
7. Mounting the warehouse floor plan (AS-1) p>
8. Warehouse floor plan (AS-2) p>
9. Timber frame walls. Nodes (AC-3, 4) p>
10. Sheet flooring (AS-5) p>
11. Statement of finishing (AC-6) p>
12. Appendix. P>
EXPLANATORY NOTE
to draft architectural and construction of the warehouse dry goods company, "an airport-Service" located at: Moscow, Sheremetyevo-3 terminal "D", of. № G4B037.
reconstruction project carried out by companies: LLC "Architectural Laboratory of Polina Nozdracheva" and "Ekoprof" ltd. The basis for the design of a specification of the customer and the tonnage plan.
The proposed reorganization of the room № G4B037 is located in the 1st floor of the terminal building "D". Total area - 67.15 sq.m. The room is proposed to reorganize under a dry goods store - 43.95 m2 with a cash room - 8.00 m2 and a video room - 7.20 m2.
1 . Work on the reorganization include:
- In the room designated for the construction of new partitions organization assistant. "1, 2,3,4." Re-perform the towns on the metal frame plasterboard lined in two layers. The device-bargaining Rodke see lists of AC-3, 4.
- in pom. "3" device on the wall metal frame with a metal door and window 600h 500mm for the issuance of money. Baffle with a reinforced profile for fastening metal doors and windows.
2. Interior decoration is designed in accordance with the TOR and the requirements of fire safety, sanitation, the charges for these facilities. Floor Statement See page AC-5. Statement of finishes see page AC-6.
3. the existing electrical network. Electricity is provided from the existing board of the building.
4. Sections for electrical, ventilation and fire alarm systems, see the individual projects.
5. The above does not violate the reconstruction of the spatial rigidity and strength of the building, keeping the design decision bearing structures and basic utilities: heat risers, sewer, water, backbone wiring, that complies with SNiP 2.08.02-89 * "Public buildings and facilities", fire and sanitation requirements.
Reconstruction project is designed in accordance with the applicable rules and regulations, as well as in accordance with the requirements of the State Supervision, TU "Rospotrebnadzor", including the explosion - fire safety. p>
Directions to the production of works
1. Before starting work, you must disable the network of water, heat and electricity supply facilities and take measures against damage.
2. All work is carried out in strict accordance with the requirements of SNiP 111-4-80, "the Safety of machinery in the building."
Fire prevention in the production of construction
To prevent fire, combustibles (toxic) building materials, components and structures in the peri-od of construction works for the reconstruction of the warehouse premises you MUST:
1. Assign responsibility for fire safety in the area under repair.
2. For construction workers take a special place for smoking with the installation of bins for cigarette butts with water.
3. In escape routes (at the outer door) to install two fire extinguishers.
4. Temporary storage of building materials, products, equipment and furniture categories historically prohibited from posting on the escape routes.
Statement of decoration
№ b> p> td>
Name b> p>
space b> p> td>
Sex b> p> td>
Ceiling b> p> td>
Walls b> p> td>
tr>
1. p> td>
warehouse, office, corridor, room for video surveillance p> td>